Mezzanine / Equipment PermitsAMFI offers complete steel structure
permit services and turnkey engineering for our mezzanines and storage products.
Many manufacturers shy away from the responsibility and work related to
obtaining permits, but we feel this is something the factory can, and should
help with. We have confidence in our design and don’t want to leave you feeling
as though we are selling you a product, we instead look out for your best
interest and make sure you’re successful in getting everything approved and
signed off.
Storage Rack / High Pile Storage Permits
If you find yourself in a situation and you need a pallet rack, drive-in
rack, push-back rack, shelving or high pile storage (fire) permit, contact us so
that we can explain your options and our course of action to get you the
approvals you need. We have in-house design, CAD, and engineering capabilities
and can more often than not get your permit faster and more cost effectively
than you may think. Don’t let the building or fire departments intimidate you,
when handled properly the process can be quick, cost effective, and usually with
little or no down time to you.
Seismic Engineering Permit Services per 2007
CBC
- Site survey by qualified individual to inspect
and identify existing storage racks
- Engineering and calculations performed by
licensed engineer
- Stamped storage rack layout plans
High Pile Storage Permit Services per CFC Chapter
23
·
Commodity
identification: Class I-IV or High Hazard per CFC
·
Sprinkler Density and
protection capabilities analysis
·
Building access
analysis
·
Smoke vent ratio
analysis (if req’d.)
·
Draft Curtain analysis
(if req’d.)
·
Pile Dimension: Floor
Storage only
·
Rack Storage
analysis
·
Flue space
analysis
·
Building column
protection analysis
·
Plans and notes
required per the 2007 CFC
|