Featured Product
End of Row Rack Protector
 Project Summary


LA License #2080


 Stay Informed of Specials
Periodically we run specials and announce new fabricated products and services. Enter your name and email address to be the first to know what's new.
Name   
Email   

Face Book


 
 Turnkey Engineering and Permit Services

Mezzanine / Equipment Permits

AMFI offers complete steel structure permit services and turnkey engineering for our mezzanines and storage products. Many manufacturers shy away from the responsibility and work related to obtaining permits, but we feel this is something the factory can, and should help with. We have confidence in our design and don’t want to leave you feeling as though we are selling you a product, we instead look out for your best interest and make sure you’re successful in getting everything approved and signed off.


Storage Rack / High Pile Storage Permits

If you find yourself in a situation and you need a pallet rack, drive-in rack, push-back rack, shelving or high pile storage (fire) permit, contact us so that we can explain your options and our course of action to get you the approvals you need. We have in-house design, CAD, and engineering capabilities and can more often than not get your permit faster and more cost effectively than you may think. Don’t let the building or fire departments intimidate you, when handled properly the process can be quick, cost effective, and usually with little or no down time to you.

 

Seismic Engineering Permit Services per 2007 CBC

 

  • Site survey by qualified individual to inspect and identify existing storage racks
  • Engineering and calculations performed by licensed engineer
  • Stamped storage rack layout plans

 

 

High Pile Storage Permit Services per CFC Chapter 23

 

·        Commodity identification: Class I-IV or High Hazard per CFC

·        Sprinkler Density and protection capabilities analysis

·        Building access analysis

·        Smoke vent ratio analysis (if req’d.)

·        Draft Curtain analysis (if req’d.)

·        Pile Dimension: Floor Storage only

·        Rack Storage analysis

·        Flue space analysis

·        Building column protection analysis

·        Plans and notes required per the 2007 CFC

 




   Home   |   Staff   |   Consulting   |   Design   |   Fabrication   |   Installation   |   Permits   |   RFQ Quote   |   Contact   |   Sitemap